San Felipe Phase 1 (EDM SF1 S.R.L.)

Status: Enera San Felipe Phase 1 (EDM SF1, S.R.L.)
Project Size: 40MW dc (total)
Location: San Felipe, Mexico
Estimated Annual Power Production: 1,849 MWh/MW/yr
Estimated Annual CO2 Offset: 135,000,000 lbs per year

SF1a_small
More About This Project >

San Felipe Phase 2

Status: Enera San Felipe Phase 2
Project Size: 95MW dc (total)
Location: San Felipe, Mexico
Estimated Annual Power Production: 1,850 MWh/MW/yr
Estimated Annual CO2 Offset: 322,200,000 lbs per year

SF1b_small
More About This Project >